EN AVANT 25
Seagoing FiFi1
ASD Tug

Ready for Offshore Work with 90 Tons Bollard Pull

Our EN AVANT 25 is a powerful and versatile tug, specifically designed for demanding offshore operations. With excellent maneuverability and high bollard pull, this tug is highly suitable for towing and assisting offshore structures, barges, and platforms. The EN AVANT 25 is equipped with modern navigation and safety systems, ensuring safe and efficient operations at sea.

DOWNLOAD SPECSHEET
Video thumbnail

Maximum Power, Ultimate Control

Our Seagoing ASD Tug EN AVANT 25 is built at Damen in Vietnam and with her 90 tons bollard pull she can operate offshore as well as in port. Her deck lay-out is outfitted for offshore operations such has towing pins, tuggers, wooden deck and crashrails.

She is also outfitted for fire fighting (FIFI-1) with 2400 m3/hr. Furthermore equipped with the latest technical gadgets, whereby the engine room is outfitted regarding the last environmental terms. Because of her ASD propulsion, her maneuverability is excellent for operating also in port. She is able to assist over the stern as well as her forecastle.

90 Tons
Bollard Pull.

Designed for demanding
offshore operations.

Boat
img

img

img

img

Have a job in mind for
us? Fill in the form and let us know!